Ingo Hochmuth
Guest
|
Posted:
Mon Sep 13, 2004 8:12 pm Post subject:
Re: ILINK v. Enovia |
|
|
Hallo Bruce,
I don't know about IBM/Dassault PDM, Enovia. But what are you searching for?
Do you search for an PDM System or for an system that knows everythink about
Pro/Engineer files and version handling.
Pro/Intralink is not realy a PDM system but it is the solution for handling
Pro/E Files.
This means you can handel other file types, but not so efficent like real
PDM Systems.
- i.a. No fulltext search. A connection to systems like SAP is possible, but
only with additional products.
When you need a PDM system with very good Pro/Engineer handling look at
Windchild (PTC).
Ingo
"Bruce Treffinger" <bruce.k.treffinger_unspame@boeing.com> wrote in message
news:4145A902.E5717CA4@boeing.com...
| Quote: | Does anyone have any experience with the IBM/Dassault PDM, Enovia? Is
it easier/better than ILINK?
Thanks.
--
The Rule of Abi-Bar-Shim (Project Mgr. - Great Pyramid):
"At some point it becomes necessary to behead all the architects and
begin construction."
eof |
|
|